An AI service that works well during testing must also remain available to thousands of users during peak demand hours. This depends on computing power, power supply, and cooling. Let us examine how this infrastructure is structured and what Ukrainian companies need to take into account.

From a test service to daily work

An online assistant prepares a response to a client in seconds, finds information in a document, or creates an image. Behind the result on the screen are physical servers in data processing centers, or data centers. They are needed both for training models and for using them. The increase in the number of users and the complexity of tasks changes the requirements for equipment and engineering systems.

According to the AI Index 2026 from Stanford University, in 2025, 88% of surveyed organizations reported using AI. At the same time, the use of AI agents capable of performing sequences of tasks remained at an early stage. This gives reason to expect growth in demand for integrating AI into workflows where the quality of the result and the predictable cost of the operation are important.

Before moving to the company's daily operations, it is necessary to organize the data, protect confidential information, define human checkpoints for reviewing results, and calculate the load. Successful testing alone is not enough to assess service availability during peak periods.

What tasks Ukrainian business automates

In a Top Lead study supported by the Ministry of Digital Transformation, published in January 2026, more than 200 companies participated. 93% of respondents reported using AI, and 62% noted a positive impact on productivity and economic indicators. These shares describe the sample, not all Ukrainian enterprises.

The most common areas among respondents included data and market analysis, forecasting, marketing and sales. Next steps could be automating the processing of requests, searching internal knowledge bases, and demand forecasting. The effect can be verified by task completion time, number of errors, and costs.

In Ukraine, infrastructure outage risks are added to the technical requirements. Requirements for backup power, communications, and recovery after failures should be determined in advance. The cloud, equipment in a provider's data center, or one's own server room are chosen taking into account the nature of the data, the required response speed, and the budget.

Why the growth of AI is changing energy consumption

According to the International Energy Agency's estimate in the Key Questions on Energy and AI 2026 report, in 2025 the world's data centers consumed 485 TWh of electricity. The main forecast for 2030 is approximately 950 TWh, or about 3% of global electricity demand. This refers to all data centers; the consumption of AI-focused facilities during this period may triple.

Individual AI tasks are becoming more energy-efficient, but the proliferation of services, video generation, and multi-step scenarios are increasing overall demand. Development requires available capacity and network connections. Operators should plan the expansion of engineering infrastructure simultaneously with the purchase of servers.

What is needed for an AI factory to operate

AI factories are often the name given to specialized complexes for training and using models. GPU graphics processors perform many operations in parallel, and their dense placement creates a high thermal load. In powerful AI configurations, the electrical power of a single server rack can exceed 100 kW.

Under such a load, servers, power, and cooling must work in coordination. If heat is not dissipated in time, equipment may slow down or shut down. Schneider Electric's solutions for AI factories involve comprehensive planning: engineering infrastructure is selected to match the computing load and future expansion.

How direct liquid cooling works

Air cooling is sufficient for many server tasks. However, in racks with a large number of powerful GPUs, its capabilities become a limitation. Direct liquid cooling, or direct-to-chip, removes heat directly from the processors.

Cooling plates are adjacent to the processors. The coolant inside them absorbs heat and transfers it further to the data center's cooling system, moving through sealed channels and pipelines. The coolant distribution unit (CDU) maintains circulation. In an architecture with a heat exchanger, it also separates the server and external loops.

Liquid cooling can be implemented in stages: using it to cool the most powerful components while servicing the rest of the equipment with air. Schneider Electric's liquid cooling solutions make it possible to select an architecture for both a new site and the modernization of an existing one. The expected energy savings should be calculated separately for each project, taking into account its load and operating conditions.

How to plan placement and control infrastructure

The first step for a business is to define the task, the expected load, and the requirements for service availability. On this basis, one can choose the deployment method and estimate the total cost of operating the solution. For own equipment, an audit of the site's capacity, redundancy, and cooling is needed. Comprehensive solutions for IT infrastructure cover racks, power, cooling, software, and service.

After launch, continuous monitoring is essential. DCIM EcoStruxure IT helps track infrastructure status, power consumption, and temperature parameters, detect deviations, and plan the placement of new equipment. This data makes it possible to assess the available resource for growth and the time for modernization.

A practical result of AI can be a faster-processed request or a more accurate forecast at an acceptable cost. It should be evaluated together with computational costs and service reliability. Infrastructure designed for real load helps preserve the result as the number of users grows.

AI is gradually becoming part of everyday business processes. For Ukrainian companies, these are opportunities for automation, increased productivity, and strengthened competitive advantages. Large-scale implementation makes computing, stable power, modern cooling, and resource management as important for digital transformation as algorithms. The future development of models and services will depend on the ability of data centers and AI factories to support growing workloads reliably, scalably, and energy-efficiently.